BESS construction management software for solar PV plants.

From the site layout to records that explain progress.

A battery energy storage system —BESS— brings together civil works, equipment, connections and checks. This proposed EPC Tracker adaptation connects the activity structure with each asset, its quantities and evidence. Scope and workflows are defined with the project team.

Illustrative diagram of battery storage alongside a solar PV plant, showing power conversion, transformers and construction tracking.
Illustrative AC-coupled BESS diagram. The project design defines the actual architecture.
THE WORKFLOW

Coordinate installation workfronts with traceable information.

  1. Organise the layout

    Relate containers, foundations, power conversion and transformers to activities. Identify assets and use the project’s current drawings.

  2. Record each operation

    Distinguish delivery, positioning, fastening and cable laying. Each record retains quantity, unit, date, owner and relevant evidence.

  3. Review quality and open items

    Track inspection plan checks and issues by asset. Quality and safety accompany all work; saving a record does not replace its review.

  4. Prepare the next milestones

    Bring together progress and open items to coordinate installation completion and prepare documentation for subsequent milestones. Commissioning and acceptance have their own tests and authorisations.

SHARED INFORMATION

Understand the BESS by asset, activity and status.

Civil works and container installation

Locate foundations and containers on the layout and consult their records. Record delivery, positioning and fastening operations with their evidence. Distinguish recorded, inspected and validated quantities to coordinate workfronts and identify open items. Each operation’s progress is interpreted within the full installation scope.

Cabling and quantities without double counting

The proposal separates cable laying by circuit from excavation and containment items. In the example, medium-voltage feeders originate at transformer stations and communications connect to the control system. A shared route does not define electrical clearances: project design and contractual measurement rules govern installation and measurement.

Evidence for progress reviews and payment proposals

Relate checks, reports and open items to completed work. Validated quantities can support payment certificate proposals when order conditions are met. Installation, pre-commissioning checks, commissioning and acceptance are treated as distinct milestones; EPC Tracker organises their records and tracking, without performing electrical switching.

BEFORE YOU START

Frequently asked questions

Is this battery operations software or an EMS?

This page presents construction execution controls. It does not offer an EMS, BMS or SCADA for operating the battery, managing charging or sending electrical setpoints. Potential integrations are defined separately.

Does the demonstration reproduce a deployed BESS implementation?

It is an illustrative recreation of a proposed adaptation, using example data. Explore layout, progress, quality, safety, cabling and review. Actual equipment, fields, permissions and workflows are agreed during implementation.

What do we need to adapt EPC Tracker to our BESS project?

Site layouts, an activity structure, an asset inventory, the BOQ, measurement rules, inspection plans, roles and order conditions. The manufacturer and project engineering team supply technical requirements and test protocols; the team defines how this information is recorded, reviewed and consulted.